Detail Engineering Works

S/NProject NameClientOwnerScope of WorkDate StartedDate Completed
253NEA IWMF SUBSTATIONROTARY SWITCHGEAR & TESTING PTE LTDErection & installation of 230/66kV transformer and GIS including accessories equipment .control cabling and cable support workOct'21Jun'22
252SMRT ANG MO KIO ONLINEMEIDEN SINGAPORE PTE LTDSMRTLTA Contract R153 /R153A power supply upgrading work for N/S/E/W line -LM Reconfiguration work at AKOOct'21
251NDT288 ANG MO KIO SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRIDErection of power transformer including control cabling workSep'21
250SMRT BISHAN DEPOT INTAKE SUBSTATION / BISHAN DEPOT SUBSTATION C&DMEIDEN SINGAPORE PTE LTDSMRTLTA Contract R153 /R153A power supply upgrading work for N/S/E/W line -Bishan Depot Intake (BDI)/ Bishan Depot S/S (BDS)Sep'21
249NDT294 SOMERSET SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRID75 MVA power transformer erection and cable diversion - Provide manpower and tools for full transformer erection under Phase 1-TF , cable diversion , AVR installation under Phase 1 & 2Aug'21
248SMRT MARSILING STATION (AC)MEIDEN SINGAPORE PTE LTDSMRTLTA Contract R153 /R153A power supply upgrading work for N/S/E/W line - AC replacement work for MSLAug'21
247EMU111 TUAS POWER 230 KV SUBSTATIONEASTERN GREEN POWER PTE LTDSP POWERGRIDOne diameter 230 GIS extension - control cabling including cable tray cable supprt work & earthing workJun'21
246NDT279 MARSILING SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRIDErection of power transformer including control cabling workJun'21Jul'21
245NDT288 KALLANG BASIN SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRIDErection of power transformer including control cabling workJun'21Aug'21
244SMRT STAMFORD INTAKE SUBSTATIONMEIDEN SINGAPORE PTE LTDSMRTLTA Contract R153 /R153A power supply upgrading work for N/S/E/W line AC replacement work for Stamford Intake S/S (SFI)May'21
243SMRT CHOA CHU KANG ONLINEMEIDEN SINGAPORE PTE LTDSMRTLTA Contract R153 /R153A power supply upgrading work for N/S/E/W line for CKOMay'21
242NDT273 BISHAN 66KV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRID75MVA transformer erectionsApr'21
241EMU100 TANJONG RHU 66KV SUBSTATIONHITACHIProvide manpower & tools to assistant for 66kV GIS Modification & replacement workMar'21Jul'21
240NDT273 Outram 66kv SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRID75MVA transformer erectionsMar'21
239NDS264 STAMFORD 66KV SUBSTATIONEASTERN GREEN POWER PTE LTDSP POWERGRID66kV GIS erection & associated equipments include cable tray,earthing & control cable works - Stamford S/SFeb'21
238NDT273 TUAS SOUTH AVE 8 66KV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRID75MVA transformer erectionsFeb'21May'21
237SMRT KRANJI STATIONMEIDEN SINGAPORE PTE LTDSMRTLTA Contract R153 /R153A power supply upgrading work for N/S/E/W line - AC & DC replacement work for KRJFeb'21
236NDT273 UBI AVE 3 66KV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRID75MVA transformer erectionsJan'21Apr'21
235SMRT RED HILL STATION (AC/DC)MEIDEN SINGAPORE PTE LTDSMRTLTA Contract R153 /R153A power supply upgrading work for N/S/E/W line - AC & DC replacement work for RDHJan'21Mar'21
234NDT273 PAYA LEBAR I 230KV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRID75MVA transformer erectionsDec'20
233SMRT BUONA VISTA STATION (AC/DC)MEIDEN SINGAPORE PTE LTDSMRTLTA Contract R153 /R153A power supply upgrading work for N/S/E/W line - AC/DC replacement work for BNVDec'20
232EMU104 TUAS SOUTH AVE 8 66KV SUBSTATIONEASTERN GREEN POWER PTE LTDSP POWERGRIDOne Bay 66kV GIS Extension. Erection associated equipment including cable tray, earthing and cabling workNov'20Jan'21
231NDT238 GRANGE RD 66KV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRIDTransformer control cables replacement workNov'20May'21
230NDS264 YASIN 66KV SUBSTATIONEASTERN GREEN POWER PTE LTDSP POWERGRIDGIS erection & associated equipments include cable tray,earthing & control cable worksOct'20
229NDS264 UBI AVE 3 66KV SUBSTATIONEASTERN GREEN POWER PTE LTDSP POWERGRIDGIS erection & associated equipments include cable tray,earthing & control cable worksOct'20Jun'21
228SMRT YISHUN AVE ONLINE (AC/DC)MEIDEN SINGAPORE PTE LTDSMRTLTA Contract R153 /R153A power supply upgrading work for N/S/E/W line - AC/DC replacement work for YAOOct'20
227NDT273 PUNGGOL 66KV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRID75MVA transformer erectionsSep'20Dec'20
226SMART YASIN INTAKE STATIONMEIDEN SINGAPORE PTE LTDSMRTLTA Contract R153 /R153A power supply upgrading work for N/S/E/W line - AC replacement work for YSISep'20Apr'21
225SMRT YEW TEE STATION (DC)MEIDEN SINGAPORE PTE LTDSMRTLTA Contract R153 /R153A power supply upgrading work for N/S/E/W line - Provide manpower & tools for installation wok of DC replacement at YWTSep'20Jan'21
224SMRT CHINESE GARDEN STATION (AC/DC)MEIDEN SINGAPORE PTE LTDSMRTLTA Contract R153 /R153A power supply upgrading work for N/S/E/W line - AC/DC replacement work for CNGSep'20
223SMRT SUNGEI BEDOK ONLINE (AC/DC)MEIDEN SINGAPORE PTE LTDSMRTLTA Contract R153 /R153A power supply upgrading work for N/S/E/W line - AC/DC replacement work for SBOJul'20
222EMU95 RANGOON 230kV SUBSTATIONEASTERN GREEN POWER PTE LTDSP POWERGRIDGIS erection & associated equipments include cable tray,earthing & control May'20Aug'20
221EMU95 UPPER JURONG 230kV SUBSTATIONEASTERN GREEN POWER PTE LTDSP POWERGRIDGIS erection & associated equipments include cable tray,earthing & control Apr'20Nov'20
220EMU95 WOODLANDS AVE 8 230KV SUBSTATIONEASTERN GREEN POWER PTE LTDSP POWERGRIDGIS erection & associated equipments include cable tray,earthing & control Apr'20Nov'20
219EMU89 ST JAMES 66KV SUBSTATIONHITACHI T&D SYSTEMS ASIA PTE LTDSP POWERGRIDOne bay GIS extension - Erection one bay 66kV GIS including controlMar'20Sep'20
218NDS240 PAYA LEBAR I 38KV SUBSTATIONEASTERN GREEN POWER PTE LTDSP POWERGRIDGIS erection & Associated equipments include cable tray, earthing & control Mar'20
217EXXONMOBILMEIDEN SINGAPORE PTE LTDTransformer replacement - Installation new 31.25MVA transformerMar'20May'20
216SMRT TAMPINES STATION (AC/DC)MEIDEN SINGAPORE PTE LTDSMRTLTA Contract R153 /R153A power supply upgrading work for N/S/E/W line - AC/DC replacement work for TAMMar'20
215NDT238 PULAU AYER MERBAU II 66KV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRID66/22kV 75MVA Power Transformer ErectionFeb '20Dec'20
214SMRT EUNOS STATION (AC/DC)MEIDEN SINGAPORE PTE LTDSMRTLTA Contract R153 /R153A power supply upgrading work for N/S/E/W line - AC/DC replacement work for EUN stationJan '20
213SMRT SUNGEI SELETAR ONLINE STATION (AC)MEIDEN SINGAPORE PTE LTDSMRTLTA Contract R153 /R153A power supply upgrading work for N/S/E/W line - AC replacement work for SSOJan '20Mar'20
212MBT TUAS SOUTH AVE 2EASTERN GREEN POWER PTE LTDMechanical Biological Treatment Plant at Tuas South - Erection of 22kV GIS and TransformerJan '20Feb '20
211SMRT CHONG PANG ONLINE (AC/DC)MEIDEN SINGAPORE PTE LTDSMRTDec '19
210NDT195 HOUGANG 66KV SUBSTATIONROTARY SWITCHGEAR & TESTING PTE LTDSP POWERGRID66/22kV 75MVA Power Transformer ErectionNov '19Dec '19
209SAKRA I 66KV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRIDErection of 2 units 75MVA 66kV power transformer inculding control cabling and supporting work at Sakra I 66kV S/SNov '19Apr '20
208NDT238 LOYANG DR 66KV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRID66/22kV 75MVA Power Transformer ErectionSep '19Nov '19
207NDT238 MARSILING 66KV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRID66/22kV 75MVA Power Transformer ErectionSep '19Feb '20
206NDT238 TOA PAYOH 66KV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRID66/22kV 75MVA Power Transformer ErectionJul '19Jul '20
205NDT238 NORTHERN TUAS 66KV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRID66/22kV 75MVA Power Transformer ErectionJun '19Sep'20
204EMU83 WOODLANDS AVE 8EASTERN GREEN POWER PTE LTDSP POWERGRIDCT'S Replacement at Woodlands Ave 8 SubstationJul '19Dec '19
203NDT238 BRIGHT HILL SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRID75MVA 66kV transformer erection at Bright Hill 66kV S/SApr '19Jul '19
202EMU89 ST JAMES 66KV SUBSTATION ONE BAY GIS EXTENSIONHITACHI T&D SYSTEMS ASIA PTE LTDSP POWERGRIDErection one bay 66kV GIS including control cabling & cable supporting workApr '20Jun '20
201NDT185 TAMPINES NEW TOWN 66kV SUBSTATION (PHASE 2) CABLE DIVERSION FOR T/F NO.1, 2, 4 & 5MEIDEN SINGAPORE PTE LTDSP POWERGRIDCable Diversion of AVR Panels for Transformers
Installation of Control Cable Trays with Supports
Laying of Control Cables between AVR and respective panel within new Control Room
Termination of Control Cables
Jun '19Aug '19
200EXXONMOBIL PIONEER ROAD 15MVA TRANSFORMER REPLACEMENTMEIDEN SINGAPORE PTE LTDEXXONMOBIL ASIA PACIFIC PTE LTDExxomobil Pioneer Road 15MVA Transformer Replacement - installation of new 15MVA transformerMar '19Mar '19
199YISHUN 66kV PHASE 2MEIDEN SINGAPORE PTE LTDSP POWERGRIDComplete erection of 1 unit of 75MVA TF and AVR Installation which includes relocation of 2 AVRs, re-termination and tie in of control cables, draining of oil from cable box, assistance for removal of lead wire from cable box, assistance on preparation for ACHV test, assistance for installation of lead wire and vacuum oil filling of cable boxJan '19Mar '19
198NDT185 - DUNEARN 66kV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRIDComplete erection works for 4x 75 MVA TransformersAug '18Jul '19
197SPPG PROJECT EMU68VO2 - 1 BAY 66kV GIS EXTENSION AT EXISTING WOODLANDS AVE 8 SUBSTATIONGE GRID SOLUTIONS PTE LTDSP POWERGRIDMay '18Sep '18
196LTA CONTRACT R153 POWER SUPPLY UPGRADING FOR NORT-SOUTH EAST-WEST LINE - WAGON MODIFICATION WORKMEIDEN SINGAPORE PTE LTDLTAJul '18Aug '18
195NDT185 - PULAU AYER MEBAU III 66kV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRIDComplete Erection of 2 x 75 MVA TransformerAug '18Nov '18
194EMU79 - 230kV POWERGRID SUBSTATION PROJECTEASTERN GREEN POWER PTE LTDSP POWERGRID3 Bays Extension GIS erection & associated Equipment including Cable Tray, Earthing & Control Cabling WorksJun '18Dec '18
193EMU59VO1 - CHOA CHU KANG II 230kV SUBSTATIONGE GRID SOLUTIONS PTE LTDSP POWERGRID1 Bay Extension GIS erection & associated Equipment including Cable Tray, Earthing & Control Cabling WorksJun '18Oct '18
192JURONG PIER SUBSTATION FOR REPLACEMENT OF AIR COMPRESSORHITACHI T&D SYSTEMS ASIA PTE LTDSP POWERGRIDJun '18Oct '18
191SPEAR PROJECT AT EXISTING TUKANG SUBSTATIONROTARY SWITCHGEAR & TESTING PTE LTDSP POWERGRIDSep '18Nov '18
190MCS37 - PAYA LEBAR II 66kV SUBSTATION TERTIARY SWITCHGEAR MAINTENANCE WORKGE GRID SOLUTIONS PTE LTDSP POWERGRIDJun '18Sep '18
189EMU83 FOR CT'S REPLACEMENT AT WOODLANDS AVE 8 SUBSTATIONEASTERN GREEN POWER PTE LTDSP POWERGRIDJun '18Aug '18
188NDT161 - CHANDER ROAD 66kV SUBSTATION (PHASE 2) CABLE DIVERSION FOR T/F NO.1 & T/F NO.2MEIDEN SINGAPORE PTE LTDSP POWERGRID2 x 75MVA Transformer Control Cable Diversion WorkApr '18Aug '18
18722kV 50MVAr TERTIARY SHUNT REACTOR INSTALLATION AT LABRADOR 230kV SUBSTATION (PHASE 2)MEIDEN SINGAPORE PTE LTDSP POWERGRID- Complete erection of Shunt Reactor including assisting with Vacuuming and Oil Filling
- Laying of Control Cables for Shunt Reactor / Switchgears / Zig-Zag Transformer
- Installation of Remote Control Panel (RCP)
- Installation of 22kV Tertiary Switchgears (6 panels)
- Installation of CTs below 22kV Cable Box during Power Cable Dock-In
- Complete Earthing works for Shunt Reactor, Tertiary Switchgears, NGR, Zig-Zag Transformer and RCP
Apr '18Jun '18
186SAKRA 66kV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRIDTransformer link replacement at Sakra SubstationApr '18Jun '18
18575MVA TRANSFORMER CABLE BOX REPLACEMENT IN EXXON MOBILEMEIDEN SINGAPORE PTE LTDEXXONMOBIL ASIA PACIFIC PTE LTDJan '18Mar '18
184NDS217 - POWERGRID SUBSTATION PROJECTEASTERN GREEN POWER PTE LTDSP POWERGRID38kV GIS Erection & Associated Equipment including Cable Tray, Earthing & Control Cabling WorksFeb '18Aug '18
183NDS206 - AYER MERBAU III 66kV SUBSTATIONEASTERN GREEN POWER PTE LTDSP POWERGRID66kV GIS Erection & Associated Equipment including Cable Tray, Earthing & Control Cabling WorksNov '17May '18
182NDT185 - TAMPINES NEW TOWN 66kV SUBSTATION (PHASE 2)MEIDEN SINGAPORE PTE LTDSP POWERGRIDCable Diversion For T/F No.4 & T/F No.5
- 2 x 75MVA Transformer Control Cable Diversion Work
Oct '17Nov '17
181NDT178 - ARMENIAN 66kV SUBSTATION (PHASE 2)MEIDEN SINGAPORE PTE LTDSP POWERGRIDCable Diversion For T/F No.1 & T/F No.2
- 2 x 75MVA Transformer Control Cable Diversion Work
Sep '17Nov '17
180NDT184 - JURONG EAST 66kV SUBSTATION (PHASE 2)MEIDEN SINGAPORE PTE LTDSP POWERGRIDCable Diversion For T/F No.1 & T/F No.2
- 2 x 75MVA Transformer Control Cable Diversion Work
Sep '17Nov '17
179NDT195 - 200MVA 230/66kV POWER TRANSFORMER PROJECTEASTERN GREEN POWER PTE LTDSP POWERGRIDOct '17Jul '18
178JURONG WEST 66kV SUBSTATION SWITCHGEAR EXTENSIONHITACHI T&D SYSTEMS ASIA PTE LTDSP POWERGRID1 bay 66kV GIS extension and associated works at existing substationSep '17Dec '17
177EMU68VO1 PROJECTMEIDEN SINGAPORE PTE LTDSP POWERGRID1 Bays GIS Extension At Existing Woodlands Ave 8 SubstationSep '17Dec '17
176NDT185 - MANDAI RAIL 66kV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRIDComplete Erection of 2 x 75 MVA TransformerJun '17Aug '17
175NDT185 - TAMPINES NEW TOWN 66kV SUBSTATION (PHASE 1)MEIDEN SINGAPORE PTE LTDSP POWERGRIDComplete Erection of 1 x 75 MVA TransformerApr '18Jan '18
174NDT185 - LABRADOR I 230kV/66kV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRIDComplete Erection of 2 x 75 MVA TransformerApr '17Jul '17
173SRC JURONG ISLANDMEIDEN SINGAPORE PTE LTDSRC75MVA LV Cable box replacement workFeb '17Feb '17
172NDT161 - CHANDER ROAD 66kV SUBSTATION TRANSFORMER NO. 2 ERECTION & CONTROL CABLING PROJECT (PHASE 1)MEIDEN SINGAPORE PTE LTDSP POWERGRID75MVA Transformer Erection
- Control Cabling Work
- Assisting Meiden PIC with Transformer Oil Treatment Work
Feb '17Apr '17
171SMRT ASSET RENEWAL - BISHAN DEPOTMEIDEN SINGAPORE PTE LTDSMRT- Renewal And Upgrade Of Power Equipment In North - South And East - West Lines For Bishan Depot

- DLO Barrier Repair Work

- Fiber Optic Cable laying from CMT office to Power Sub-Station C at Bishan Depot
Feb '17Oct '17
170CONTRACT WS 4000014609 JURONG EAST INVERTER IV301 REPLACEMENTMEIDEN SINGAPORE PTE LTDSMRTRemoval & install of Inverter system including cabling and supply install of cable supporting systemFeb '17Apr '17
169UAS POWER STATION - 400kV SWITCHHOUSE COMMUNCATION CABLING WORKTUAS POWER GENERATION PTE LTDTUAS POWER GENERATION PTE LTDCable laying from 400kV Building Service Switch room to Stage 2 Central Control RoomJan '17Feb '17
168NDS182 - WEST JURONG ISLAND SUBSTATIONEASTERN GREEN POWER PTE LTDSP POWERGRIDGIS Erection & Associated Equipments Include Cable Tray, Earthing & Control Cabling WorksDec '16Jun '17
167NDT161 - CHANDER ROAD 66kV SUBSTATION TRANSFORMER ERECTION & CONTROL CABLING PROJECT (PHASE 1)MEIDEN SINGAPORE PTE LTDSP POWERGRID75MVA Transformer Erection
- Control Cabling Work
- Assisting Meiden PIC with Transformer Oil Treatment Work
Oct '16Dec '16
166NDT184 - YISHUN AVENUE 7 66kV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRIDComplete erection of 1 unit of 75MVA TransformerNov '16Dec '16
16522kV 50MVA TERTIARY SHUNT REACTOR, LABRADOR 230kV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRIDComplete erection of Shunt Reactor and Control Cabling WorkOct '16Dec '16
164NDT185 - MACALISTER 66kV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRIDComplete Erection of 2 x 75 MVA Transformer
Oct '16Dec '16
163SIN MING INDUSTRIAL ESTATE 66kV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRIDComplete Erection of 2 x 75MVA 66kV TransformerSep '16Dec '16
162SIMS AVENUE 66kV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRIDComplete Erection of 2 x 75MVA 66kV TransformerSep '16Dec '16
161NDT184 - YISHUN AVENUE 7 66kV SUBSTATION (PHASE 1)MEIDEN SINGAPORE PTE LTDSP POWERGRIDSupply & Installation Of 75MVA Of Feeder Transformers & Ancillary EquipmentSep '16Sep '16
160SMRT ASSET RENEWAL AND UPGRADE OF POWER EQUIPMENTMEIDEN SINGAPORE PTE LTDSMRT-Renewal and upgrade of power equipment in East - West lines for Lavender Station, Delta On-line Station

- Provision of manpower and tools for replacement of Transformer Gauges at Pioneer and Braddell MRT station

- Provision of Mobile Scaffold for MCT installation Work @ Raffles Place MRT

- RT 404 Cable Box Works at City Hall Mrt Station
Sep '16Jun '17
159NDT185 - TRANSFORMER PROJECT - BULIM 66kV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRID66/22kV 75MVA Transformer Work - Laying of Control Cables with Trays and Termination Work for Control CablesAug '16Aug '16
158NDT161 - TRANSFORMER PROJECT - CHANDER ROAD 66kV SUBSTATION (PHASE 1)MEIDEN SINGAPORE PTE LTDSP POWERGRID66/22kV 75MVA Transformer Work - Chander Road 66kV Substation

Phase 1 - Control Cabling Diversion Works for 2x Transformers; T/F No.3 & 4
Jul '16Jul '16
157TUAS POWER STATION PROJECTROTARY SWITCHGEAR & TESTING PTE LTDTUAS POWER GENERATION PTE LTDTuas Power Station Project - Modification And Conversion Of Existing
400kV Diameter 4 For Tie-In Powergrid Auto Transformer No. 4 Circuit
Jul '16Feb '17
156NDT178 - ERECTION OF TRANSFORMER AND SHUNT REACTOREASTERN GREEN POWER PTE LTDSP POWERGRIDIncluding associated equipment, cable tray, earthing and control cabling for:
- Jurong Pier 230kV Substation
- Labrador I 230kV Substation
- Upper Jurong 230kV Substation
- Ayer Rajah II 230kV Substation
- Tuas 400kV Substation
May '17Jun '17
155NDT184 - JURONG EAST 66kV SUBSTATION TRANSFORMER ERECTION & CONTROL CABLING PROJECT PHASE 1SP POWERGRID75 MVA Transformer Erection
Control Cabling Work
Assisting with Transformer Oil Treatment Work
Apr '16Apr '16
154SP POWERASSETS PROJECT NDT135EASTERN GREEN POWER PTE LTDSP POWERGRIDUpper Jurong II 230/66kV SubstationMar '16May '16
153JURONG PIER 66kV SUBSTATIONHITACHI T&D SYSTEM ASIA PTE LTDSP POWERGRID4 bay switchgear extension and associated works at existing substationJan '16Mar '16
152NDT134 - TAMPINES SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRIDControl Cabling works of 75 MVA Transformer

Complete Erection of 75 MVA Transformer
Nov '15Dec '15
151NDT127 - BANYAN DRIVE 66kV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRIDComplete Transformer Erection, including Control Cabling Works.Nov '15Dec '15
150NDT170 - CHANGI EXPO 66kV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRIDComplete Erection of Two (02) Units SF6 Power Transformer.Nov '15Dec '15
149NDT134 - MARINA CENTER SS 2x75MVA TRANSFORMERMEIDEN SINGAPORE PTE LTDSP POWERGRIDComplete Transformer Erection, including Control Cabling Works.Oct '15Nov '15
148NDT127 - SUNVIEW WAY 1 66kV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRIDComplete Transformer Erection, including Control Cabling Works.Sep '15Oct '15
147EXXONMOBIL AURORA-EOS PROJECTSANKO SINGAPORE PTE LTDEXXONMOBIL ASIA PACIFIC PTE LTDElectrical Works for Substation (SS420 & SS421)Sep '15Jul '17
146NDT161 - ARMENIAN 66KV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRIDSupply & Install of Cable Tray including Control Cable Laying & Termination. Normalisation of Control Cabling.Aug '15Jun '16
145SMRT QX15-002 PROJECTMEIDEN SINGAPORE PTE LTDSMRTAsset Renewal & Upgrade of Power Equipment in North-South Line on City Hall, Somerset, Raffles & Newton Substations.Sep '15Dec '15
144PLP 2x400W CCP PROJECT - ADD 2 NOS. VSD FOR BFP UNIT 10 & 20SIEMENS PTE LTDPACIFICLIGHT POWER PTE LTDInstall 2 nos. VSD. Supply & Install HDG Cable Trays for MV Cables. Supply MV,LV & Control Cables between PCC & E-housing.Aug ' 15Sep '15
143MASS RAPID TRANSIT LEMBAH KELANG-JAJARAN SUNGAI BULOH-KAJANGMEIDEN MALAYSIA SDN BHDMRT CORPORATION SDN BHDSupply & installation of Steel Support for Cable Drum Stand on MRT Flat Wagon.May '15Jul '15
142NDT134 - TUKANG INNOVATION DRIVE 66KV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRIDComplete Erection of Two (02) units 66/22kV 75MVA Transformer.Oct '14Mar '15
141NDT134 - RAFFLES 66KV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRIDComplete Erection of Two (02) units 66/22kV 75MVA Transformer.Sep '14Jan '15
140NDT134 - HOUGANG 66KV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRIDSupply & Install of Cable Tray including Control Cable Laying & Termination.Sep '14Nov '14
139EMU59 - JURONG PIER 66kV SUBSTATIONHITACHI T&D SYSTEM ASIA PTE LTDSP POWERGRIDInstallation of Two (02) bays 66kV GIS & Associated Equipment, Control Cabling Works including Supply & Installation of Cable Tray and Power Cable Support.
Aug '14Nov '15
138NDT127 - TUAS WEST DRIVE 66kV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRIDSupply & Install of Cable Tray including Control Cable Laying & Termination Works for 2 Units 75MVA Transformer.Jul '14Mar '15
137NDT134 - KALLANG BASIN 66kV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRIDSupply & Install Cable Tray including Control Cable Laying & Termination.Aug '14Apr '15
136EMU59 - PAYA LEBAR II 230kV SUBSTATIONEASTERN GREEN POWER PTE LTDSP POWERGRIDInstallation of One Diameter GIS, Associated Equipment, including Supply & Installation of Cable Tray, Power Cable Support, Control Cable Laying & Termination.Dec '14Jun '15
135NDS146 - PIONEER ROAD 66kV SUBSTATIONALSTOM GRID PTE LTDSP POWERGRIDInstallation of 14 Bays 66kV GIS & Associated Equipment. Supply & Installation of Cable Tray & Power Cable, Control Cable Laying & Termination.Sep '14Mar '15
134NDT135 - UPPER JURONG II 230kV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERGRIDComplete Erection of Two (02) Units 230/66kV 200MVA Transformer and One Unit 100MVA Shunt Reactor.
Aug '14Nov '15
133MRT TUAS WEST EXTENSION - LTA CONTRACT 1653MEIDEN SINGAPORE PTE LTDLTAComplete Erection of Two Units 66/22kV 60MVA TransformerJun '14May '15
132NDS125 - TUAS WEST DRIVE 66kV SUBSTATIONALSTOM GRID PTE LTDSP POWERGRIDInstallation of 14 Bays 66kV GIS & Associated Equipment. Supply & Installation of Cable Tray & Power Cable, Control Cable Laying & Termination.May '14Nov '14
131SENOKO POWER STATION - TEMPORARY POWER SUPPLY FOR EOWI CCP6 & 7HITACHI PLANT & CONSTRUCTIONSENOKO ENERGY PTE LTDSupply & Installation of Power DB and Cables.
Manpower Supply for Assist of EOWI.
Apr '14Aug '14
130MALAYSIA, PENANG
PRAI CCGT POWER PLANT
SAMSUNG C&T (KL) SDN BHDTNBElectrical & Instrument Works.Apr '14Dec '15
129NDS137 - UPPER JURONG II 230kV SUBSTATIONEASTERN GREEN POWER PTE LTDSP POWERGRIDInstallation of 230kV GIS & Associated Equipment including Cable Support & LV Control Cabling. Supply & Installation of Cable Support & Earthing System.Jun '14Sep '15
128NDS137 - CHANGI EAST 230kV SUBSTATIONEASTERN GREEN POWER PTE LTDSP POWERGRIDInstallation of 230kV GIS & Associated Equipment including Cable Support & LV Control Cabling. Supply & Installation of Cable Support & Earthing System.Aug '14Aug '15
127NDT125 - PUNGGOL 66kV SUBSTATIONALSTOM GRID PTE LTDSP POWERGRIDInstallation of 16 Bays 66kV GIS & Associated Equipment. Supply & Installation of Cable Tray & Power Cable, Control Cable Laying & Termination.Feb '14Aug '14
126SINGAPORE MRT PROJECT WOODLANDS (WDL) LTA CONTRACT T1253MEIDEN SINGAPORE PTE LTDLTA / SMRTAddition & Alteration Works for Installation of Power Supply Equipment including Power/Control Cabling.Feb '14Oct '14
125WOODLANDS AVE. 8 66KV SUBSTATION - 4 BAYS EXTENSION PROJECTALSTOM GRID PTE LTDSP POWERGRIDInstallation of Four Bays 66kV GIS & Associated Equipment. Supply & Installation of Cable Tray & Power Cable, Control Cable Laying & Termination.Feb '14Jul '14
124BRIGHT HILL 66KV SUBSTATION - TWO BAYS EXTENSION PROJECTALSTOM GRID PTE LTDSP POWERGRIDSupply & Installation of Cable Tray including Control Cable Laying & Termination.Oct '13Feb '14
123SINGAPORE MRT TUAS WEST EXTENSION - LTA CONTRACT 1653ALSTOM TRANSPORT (S) PTE LTDLTA / SMRTAddition 7 Alteration Works for Installation of Power Supply Equipment & Accessories on
Existing MRT station:-
a) Sungei Ulu Pandan On-line Station (SUO).
b) Jurong East Station (JUR).
c) Joo Koon Station (JNK).
Oct '13Jun '14
122SENOKO POWER STATION - REPLACEMENT OF 31.5MVA 66kV TRANSFORMERMEIDEN SINGAPORE PTE LTDSENOKO ENERGY PTE LTDComplete Erection of 2 Units 66/22kV 31.25MVA Transformer, including Control Cabling.Oct '13Apr '14
121NDS98 - RANGOON ROAD 400/230/66kV SUBSTATIONALSTOM GRID PTE LTDSP POWERASSETS LTDErection of Tertiary GIS & Associated Equipment including Cable support & LV control cabling.Jun '13Feb '14
120NDT110 - PIONEER CRESCENT 66kV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERASSETS LTDComplete Erection of Two Units 75MVA Transformer including Control Cabling Works.Apr '13Nov '13
119EMU50A - TUAS POWER STATION 230kV SUBSTATIONSUMITOMO CORPAORATIONSP POWERASSETS LTDReftrofitting of PDM Sensors, Flanges & Associated Works on 230kV Switchgear for Tuas & Admiralty West Substation.May '13Jan '14
118EMU49 - TUAS POWER STATION 230kV SUBSTATIONPOWER AUTOMATION / EASTERN GREEN POWER PTE LTDSP POWERASSETS LTDErection of 230kV GIS, Associated Equipment, including Supply & Installation of Cable Supports and LV control Cabling for One Dia. 230kV GIS Extension.Apr '13Jan '14
117NDS98 - RANGOON ROAD 400/230/66kV SUBSTATIONEASTERN GREEN POWER PTE LTDSP POWERASSETS LTDErection of 230kV & 66kV GIS, Associated Equipment, LV Power/Control including Supply & Installation of Cable Supports and Earthing System.Jan '13Feb '14
116TT120018 - PHASE 2 SALE REMOVAL AND DISPOSAL OF STAGE 3 ELECTRICAL CABLESYTL POWERSERAYA PTE LTDSP POWERASSETS LTDSupply & Erection of Perimeter Steel Hoarding.
Removal, Disposal & Sale of Stage 3 electrical Cables.
Sep '12Jan '13
115PACIFICLIGHT POWER 2x400MW CCP PROJECT AT JURONG ISLANDSAMSUNG C&T CORPORATIONPACIFICLIGHT POWER PTE LTDElectrical & Instrumentation
Works, including supply & Installation of Earthing & Lightning Protection System
Jan '12Dec '13
114NDS98 - RANGOON ROAD 400/230/66kV SUBSTATIONHI POWER PTE LTD / ROTARY SWITCHGEAR & TESTING PTE LTDSP POWERASSETS LTDErection of 400kV GIS & Associated Equipment, LV Power/Control Cabling including Cable Supports and Earthing System.Oct '12Feb '14
113TEMBUSU MULTI UTILITIES COMPLEXMEIDEN SINGAPORE PTE LTDTUAS POWERErection of 66/22kV 75MVA & 22kV/LV 15MVA Transformer.Aug '11Nov '11
112NDS98 - BOON LAY 66kV SUBSTSTAIONEASTERN GREEN POWER PTE LTDSP POWERASSETS LTDErection of 66kV GIS & Associated Equipment, including Cable Supports and LV Control Cabling.Mar '11Sep '11
111NDT82 - TAMPINES 230kV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERASSETS LTDErection of Two Units 230kV 100MVA Shunt Reactors, including Cable Supports and LV Control Cabling.Mar '11Sep '11
110NDS56 - ST. JAMES 66kV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERASSETS LTDErection of 66kV GIS & Associated Equipment, including Cable Supports and LV Control Cabling.May '11Jan '12
109NDT82 - TUAS POWER STATION 230kV SUBSTATION & PULAU SERAYA POWER STATION 400kV SUBSTATION.EASTERN GREEN POWER PTE LTDSP POWERASSETS LTDErection of 230kV 200MVA Shunt Reactor at Tuas Power Station & 400kV 100MVA Shunt Reactor, including Cable Support System & LV/Control Cabling.Nov '10Jan '12
108FACI ASIA PACIFIC PTE LTD PHASE III NEW EXTENSION FOR NEW FLAKERS FILLING UNITFACI ASIA PACIFIC PTE LTDFACI ASIA PACIFIC PTE LTDPlant Electrical & Instrumentation Works, including Supply of Cables & Cable Supporting system.Aug '10Apr '11
107SENOKO POWER STATION STAGE II REPOWERING COMBINED CYCLE PLANT CCP6 & 7HITACHI TECHNOLOGIES, LTDSENOKO POWER LTDDemolish of Electrical Equipment. Supply & Install22kV/415V 2MVA Transformer & LV Switchgear including Cabling for Construction Temporary Power. Underground Earthing Grid & Conduit Pipe Works. Electrical & Instrumentation Works, including Supply of Cables & Cable Supporting System.May '10Aug '12
106EMU42 - TUAS POWER STATION 66kV AND AYER MERBAU II 66kV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERASSETS LTDErection of 1 Bay Extension 66kV GIS & Associated Equipment, including Cable Supports & Earthing System and Control Cabling Works.Nov '09Jan '11
105NDS60 - CHOA CHU KANG 230kV SUBSTATIONEASTERN GREEN POWER PTE LTDSP POWERASSETS LTDErection of 230kV GIS & Associated Equipment, including Cable Supports and LV Control Cabling.Oct '09Nov '10
104EXXON MOBIL CHEMICAL - SPT PROJECTSANKO SINGAPORE PTE LTDEXXON MOBIL SINGAPOREPlant Electrical Works, including MV/LV Switchgear & Transformer, Cable Supports & Cabling Works.Jun '09Dec '10
103NDS70 - TUAS SOUTH
AVE. 14 66kV SUBSTATION
AREVA T&D PTE LTDSP POWERASSETS LTDErection of 66kV GIS & Associated Equipment, including Cable Supports and LV Control Cabling.Aug '09Apr '10
102NDS70 - TUAS SOUTH
AVE. 8 66kV SUBSTATION
EASTERN GREEN POWER PTE LTDSP POWERASSETS LTDErection of 66kV GIS & Associated Equipment, including Cable Supports and LV Control Cabling.May '09Feb '09
101NDS70 - PULAU AYER MERBAU I 66kV SUBSTATIONEASTERN GREEN POWER PTE LTDSP POWERASSETS LTDErection of 66kV GIS & Associated Equipment, including Cable Supports and LV Control Cabling.Aug '09May '10
100NDS62 - MANDAI 66kV SUBSTATIONEASTERN GREEN POWER PTE LTDSP POWERASSETS LTDErection of 66kV GIS & Associated Equipment, including Cable Supports and LV Control Cabling.Feb '10Oct '11
99NDS62 - INTERNATIONAL ROAD 66kV SUBSTATIONEASTERN GREEN POWER PTE LTDSP POWERASSETS LTDErection of 66kV GIS & Associated Equipment, including Cable Supports and LV Control Cabling.Feb '10Mar '11
98NDS62 - AIDA 66kV SUBSTATIONEASTERN GREEN POWER PTE LTDSP POWERASSETS LTDErection of 66kV GIS & Associated Equipment, including Cable Supports and LV Control Cabling.Jun '09Feb '10
97NDS62 - WESTCOAST 66kV SUBSTATIONEASTERN GREEN POWER PTE LTDSP POWERASSETS LTDErection of 66kV GIS & Associated Equipment, including Cable Supports and LV Control Cabling.Feb '09Sep '09
96POWERSERAYA COGEN CCP 30 & 40 & CCP 10 & 20 CONVERSIONSAMSUNG C&T CORPORATIONPOWERSERAYA LTDSupply of Equipment, Tools, Consummable Materials & Manpower for Complete Installation of Electrical & Instrumentation Work Package, including Works at PCS Compound & Service Corridor & PowerSeraya Worksite.Dec '08Feb '10
95PENG GUAN 230kV SUBSTATION - ONE BAY 230kV GIS EXTENSIONAREVA T&D PTE LTDSP POWERASSETS LTDErection of 230kV GIS & Associated Equipment, including Cable Supports and LV Control Cabling.Jul '08Mar '09
94WOODLANDS AVE. 8 230kV SUBSTATION - ONE DIAMETER 230kV GIS EXTENSIONAREVA T&D PTE LTDSP POWERASSETS LTDErection of 66kV GIS & Associated Equipment, including Cable Supports and LV Control Cabling.Nov '08Mar '09
93KAMPONG BAHRU 66kV SUBSTATION - TWO BAY 66kV GIS EXTENSIONAREVA T&D PTE LTDSP POWERASSETS LTDErection of 66kV GIS & Associated Equipment, including Cable Supports and LV Control Cabling.Oct '08Mar '09
92PAYA LEBAR 400kV SUBSTATIONAREVA T&D PTE LTDSP POWERASSETS LTDErection of 400kV Bus Trunking to (ABB) shunt Reactor and (AREVA) Auto-Transformer.Jul '08Mar '09
91PAYA LEBAR 400kV SUBSTATIONEASTERN GREEN POWER PTE LTDSP POWERASSETS LTDErection of 500MVA Auto-Transformer, including Cable supports & LV control Cabling.Jun '08May '09
90PULAU BUKOM 66kV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERASSETS LTDErection of 66kV GIS & Associated Equipment, including Cable Supports and LV Control Cabling.Jun '08Jun '09
89WOODLANDS AVE. 8 230kV SUBSTATION - ONE DIAMETER 230kV GIS EXTENSIONEASTERN GREEN POWER PTE LTDSP POWERASSETS LTDErection of Supporting System, including LV Control Cabling.Apr '08Jul '08
88SP POWERGRID NDT57 REPLACEMENT OF 230kV SHUNT REACTOR FOR - SENOKO POWER STATION & AYER RAJAH I SUBSTATIONEASTERN GREEN POWER PTE LTDSP POWERGRIDDismantle, Dispose & Erection of 230kV 100MVA Shunt Reactors & Associated Equipment, Cable Supports and Cabling Works.Mar '08Mar '09
87IMFT 66kV SUBSTATIONAREVA T&D PTE LTD / MEIDEN SINGAPORE PTE LTDINTEINTEL MICRON FLASH SINGAPOREErection of Two Units 66/22kV 75MVA Transformer, Associated Equipment, Cable Supports and LV Control Cabling Works.Mar '08May '08
86PULAU SERAYA POWER STATION COMBINE CYCLE POWER PLANT CCP BLOCK 30& 40SAMSUNG CORPORATIONPOWERSERAYA LTDInstallation of Temporary Supply for the Construction Power.Dec '07Feb '08
85IMFT 66kV SUBSTATIONAREVA T&D PTE LTDINTEL MICRON FLASH SINGAPOREInstallation of 8 Bays GIS & Associated Equipment, Cable Supports & Cabling Works.Nov '07May '08
84MRT BOON LAY EXTENSION CONTRACT 1293 FOR - PIONEER & JOO KOON STATIONSMEIDEN SINGAPORE PTE LTDLTAPower Supply Erection for Electrical Equipment, Cable Supports & Cabling Works.Nov '07Jan '09
83UNMATEC CHEMICAL PLANTSANKO SINGAPORE PTE LTDUNIMATECProcess Plant Electrical Works & Installation of 22kV Switchgear, 22kV/415V Transformer, LV Switchboard & and Cabling Works.Apr '07Jul '07
82UMCI 66/22kV SUBSTATIONUMCI 66/22kV SUBSTATIONUMCIErection of 66kV GIS, Ancillary Equipment & Control Cabling Works.Feb '07Apr '07
81UMCI 66/22kV SUBSTATIONMEIDEN SINGAPORE PTE LTDUMCIErection of Two Units 66/22kV 75MVA Transformer, Associated Equipment, Cable Supports and LV Control Cabling Works.Feb '07Apr '07
80PALUA SERAYA POWER STATION - CONSTRUCTION OF SEAWATER DESALINATION PLANTCH2M HILL SINGAPORE PTE LTDPOWERSERAYA LTDSupply & Installation of Plant Electrical Equipment, including Cable Supports & Cabling Works.Dec '06Jul '07
79THOMSON 66/22kV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERASSETS LTDErection of Two Units 66/22kV 75MVA Transformer, Associated Equipment, Cable Supports and LV Control Cabling Works.Nov'06Apr '07
78SENG KANG 66kV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERASSETS LTDErection of Two Units 66/22kV 75MVA Transformer, Associated Equipment, Cable Supports and LV Control Cabling Works.Oct '06Nov '06
77MRT CIRCALE LINE STAGE 3 FOR - BARTLEY, SERANGOON, LORONG CHUAN, BISHAN & MARYMOUNT STATIONSALSTOM TRANSPORT (S) PTE LTDLTA22kV GIS, Service Transformers, Traction Transformers, Traction & control Panels Installation Works.
Cable Support system, Laying of 22kV Power Cables, 585V AC / 750V DC Power Cables, Fibre Optic Cables & Termination Works.
Sep '06Apr '08
76LADBRADOR I 230Kv & PAYA LEBAR I 230kV SUBSTATIONSUMITOMO CORPORATION MITSUBISHI ELECTRICSP POWERASSETS LTDErection & Retrofitting of PDM System.Aug '06Mar '07
75TAMPINES WAFER 230kV SUBSTATIONMEIDEN SINGAPORE PTE LTDSP POWERASSETS LTDErection of One Unit 230kV GIS stand-alone for PST.Apr '06Jul '06
74PAYA LEBAR I SUBSTATIONTONG GUAN RESOURCES PTE LTDSP POWERASSETS LTDDismantling & Disposal of Two Units Ext'g 230kV 2x25MVA Shunt Reactor, HV Power Cable & Associated Equipment.
Erection of Two Units 230kV 50MVA Shunt Reactor, Associated Equipment, Cable Trays and Cabling Works.
Apr '06Dec '06
73OUTRAM 66kV SUBSTATIONABB INDUSTRY LTDSP POWERASSETS LTDDismantling of Existing 66kV GIS & Accessories.Mar '06Mar '06
72DENKA (SPS-2 & NCP-3) PROJECT AT JURONG ISLANDSANKO SINGAPORE PTE LTDDENKA SINGAPORE PTE LTDErection of Substation Equipment, Main Cable Way & Plant Lighting & Small Power.Sep '05Apr '06
71KEPPEL MERLIMAU COGENERATION PLANT AT JURONG ISLANDALSTOM POWER SINGAPORE PTE LTDKEPPEL MERLIMAU COGEN PTE LTDBuilding Electrical Small Power 7 Lighting, Lightning Protection System, Public Address, Telephone/PABX & Radio Pager System & ACMV System.Aug '05Mar '07
70PAYA LEBAR I SUBSTATIONSUMITOMO CORPORATION MITSUBISHI ELECTRICSP POWERASSETS LTDModification & Repair of 230kV/66kV Transformer.Jun '05Dec '05
69ST MICROELECTRONICS 66kV SUBSTATIONAREVA T&D PTE LTDST MICROELECTRONICS PTE LTDInstallation of 66kV T/F & Equipment, Earthing & Cable Supports, including 66kV & 22kV HV Power Cabling & LV Power/Control Cabling Termination Works.Apr '05Jul '05
68PAYA LEBAR II 400kV SUBSTATIONTONG GUAN RESOURCES PTE LTDSP POWERASSETS LTD400kV GIS Cable Supports, & Control Cabling Works, including control/Protection Panels Erection.Apr '05Mar '06
67WOODLANDS AVE. 8 230kV SUBSTATIONAREVA T&D PTE LTDSP POWERASSETS LTDErection of 66kV & 38kV GIS Ancillary Equipment and control Cabling Works.Mar '05Apr '06
66SENOKO POWER STATION STAGE I REPOWERING PHASE II CCP4 & 5ALSTOM POWER SINGAPORE PTE LTDSENOKO POWER LTDAir-conditioning System for Plant Battery Rooms.Mar '05Jul '05
65WOODLANDS AVE. 8 230kV SUBSTATIONTONG GUAN RESOURCES PTE LTDSP POWERASSETS LTDCable Supporting Works for 230kV GISMar '05Jul '05
64KEPPEL MERLIMAU COGENERATION POWER STATION AT JURONG ISLANDALSTOM POWER SINGAPORE PTE LTDKEPPEL MERLIMAU COGEN PTE LTDDesign, Supply and Erect a 22kV/6.6kV/415V Temporary Substation. Supply, Install. Testing & Commissioning of 22kV/6.6kV 10MVA & 22kV/415V 2MVA Transformers, 415V Main Switchboard to Field Area for Construction Use.
Supply & Install 6.6kV Power Cable Power to Plant MV Switchboard for Commissioning Use.
Mar '05Mar '07
63POWERSAERAYA POWER STATION STAGE I ORIMUSION PROJECTISHIKAWAJIMA-HARIMA HEAVY INDUSTRIES CO. LTD.POWERSERAYA LTDReplacement stage I Generator 1, 2 & 3 CT's & VT's and T/F 1, 2, & 3 CT's including Testing.Feb '05Apr '05
62FATTY ACIDS DERIVATIVES ESTER PLANTFACI ASIA PACIFIC PTE LTDFACI ASIA PACIFIC PTE LTDProcess Plant Electrical & Instrumentation Works.Jan '05Sep '05
61KIM CHUAN 66kV SUBSTATIONTONG GUAN RESOURCES PTE LTDSP POWERASSETS LTDSupply & Install Cable Trays & Earthing System.Dec '04Jun '05
60SMAG II PROJECT AT JURONG ISLANDSANKO SINGAPORE PTE LTDSINGAPORE METHYL METHACRYLATE PTE LTDSubstation Electrical Equipment Erection & Lighting & Small Power Installation.Oct '04Mar ' 05
59SENOKO POWER STATION STAGE I REPOWERING PHASE II CCP4 & 5ALSTOM POWER SINGAPORE PTE LTDSENOKO POWER LTDVentilation System fo CCP3, 4 & 5, Including Modification of Existing Steel Structure Roof for CCP3 MV Fan Supports & Maintenance Walkway. May '04May '04
58TUAS `A' POWER STATION STAGE II DEVELOPMENT - BLOCK 3 & 4TOSHIBA ASIA PACIFIC PTE LTDTUAS POWER LTDErection of 400kV Busducts, Surge Arrestors & Associated Works.Apr '04Apr '05
57PAYA LEBAR 230/66kV SUBSTATIONAREVA T&D PTE LTDPOWERGRIDInstallation 230/66kV GIS & Associated Equipment, Cable Supports, Control & Protection Panels Cabling Works and Panels Installation.Apr '04Feb '05
56TUAS `A' POWER STATION STAGE I DEVELOPMENT - BLOCK 3 & 4HITACHI PLANT ENGINEERING & CONSTRUCTION PTE LTDTUAS POWER LTDInstallation of Cable Trays, conduit Pipes & Supports.Apr '04Apr '05
55SOXAL 66kV SUBSTATION EXTENSIONALSTOM T&D PTE LTDPOWERGRIDInstallation of 1 Bay Extension 66kV GIS & Associated Equipment, Cable Supports, Control & Protection Panels Cabling Works and Panels Installation.Sep '03Oct '03
54SENOKO POWER STATION STAGE I REPOWERING - UPGRADE OF GENERATOR TRANSFORMERHITACHI PLANT ENGINEERING & CONSTRUCTION PTE LTDSENOKO POWER LTDDismantling & Disposal of Existing CCP3, 4 & 5 Generator Transformer & IPB. Installation of New IPB & GCB from Steam Generator to Generator Transformer & its Associated Equipment, including Cabling.Aug '03May '04
53FATTY ACIDS DERIVATIVES PLANT PHASE IIFACI ASIA PACIFIC PTE LTDFACI ASIA PACIFIC PTE LTDSupply & Installation Building Lighting & Small Power, ACMV, Plumbing & Sanitary and Fire Fighting & Fire Alarm System.Apr '03Feb '04
52SENOKO POWER STATION STAGE I REPOWERING PHASE II COMBINED CYCLE PLANT CCP4 & 5ALSTOM POWER SINGAPORE PTE LTDSENOKO POWER LTDSupply & Installation of 22kV/415V, 2MVA Transformer and LV Main & sub-Distribution Board for Temporary Power.Nov '02Dec '02
51SENOKO POWER STATION STAGE I REPOWERING PHASE II COMBINED CYCLE PLANT CCP4 & 5ASLTOM POWER SINGAPORE PTE LTD / ZELAN CONSTRUCTION PTE LTDSENOKO POWER LTDDesign, Supply & Installation of building Lighting & Small Power. Supply & Intsalltion of Earthing System.Nov '02Jul '04
50FATTY ACIDS DERIVATIVES PLANT PHASE I EXTENSIONFACI ASIA PACIFIC PTE LTDFACI ASIA PACIFIC PTE LTDSupply & Installation of Process Plant Electrical Works.Nov '02Jul '04
49TAMPINES 230kV SUBSTATION EXTENSIONALSTOM T&D PTE LTDPOWER GRID SINGAPOREInstallation of 1 Bay Extension 230kV GIS & Associated Equipment, Supports, Control & Protection cabling & Panels.Oct '02Dec' 02
48WOODLANDS WAFER 66kV SUBSTATION EXTENSIONALSTOM POWER SINGAPORE PTE LTDPOWER GRID SINGAPOREInstallation of 2 Bay Extension 66kV GIS & Associated Equipment, Supports, Cabling & Panels.Jul '02Oct '02
47SENOKO POWER STATION REPOWERING STAGE I PHASE 2 -CCP 4 & 5ALSTOM POWER SINGAPORE PTE LTDSENOKO POWER LTDDismantling & De-commissioning - stage I 3.3kV system.Jun '02Oct '02
46SENOKO POWER STATION SWITCHHOUSE `A'ALSTOM T&D PTE LTDSENOKO POWER LTDTray & Cabling for PDM & Panel Modification for Transient Recorder.May '02Jul '03
45SENOKO POWER STATION REPOWERING STAGE I PHASE 1 -CCP 3ALSTOM POWER SINGAPORE PTE LTDSENOKO POWER LTDReplacement of 230kV 1000sq.mm XLPE Cable.May '02Jun '02
44STELLA CHEMIFA PROJECTSANKO SINGAPORE PTE LTDSTELLA CHEMIFAProcess Plant electrical & Instrumentation Works.Mar '02Jul ' 02
43PULAU SAKRA MBS 3 PROJECTSANKO SINGAPORE PTE LTDMBSPlant electrical & Instrumentation Works, including Installation of Substation Equipment.Oct '01Apr '02
42MPHS SDM PROJECTSANKO SINGAPORE PTE LTDMITSUI CHEMICAL ENGINEERING CO.Electrical & Instrumentation works.Oct '01Oct-01
41PCS II NEW FURNACE / SDM PROJECTSANKO SINGAPORE PTE LTDPETROLCHEMICAL CORPORATION OF SINGAPORE (PTE) LTDInstall & Erect Instrumentation Equipment, including Cable Laying & Termination.Mar '01Aug '01
40PULAU SAKRA MBS 2 PROJECTSANKO SINGAPORE PTE LTDMBSPlant Electrical & Instrumentation works, including Installation of substation Equipment.Dec '00Jul '01
39PULAU SERAYA COMBINED CYCLE POWER PLANTSIEMENS ADVANCED ENGINEERING PTE LTDPOWER SERAYA LTDSupply & Installation of Temporary Power supply Cables & Switchboards. Excavation of Trail Holes & 22kV Cables Diversion Works.Aug '00Oct '01
38RIVER VALLEY CLOSE 66kV SUBSTATIONALSTOM T&D PTE LTDPOWER GRID SINGAPORE66kV GIS & Associated Equipment Installation, Cable Supporting &
Termination Works.
Jul '00Dec '00
37FATTY ACIDS DERIVATIVES PLANT AT JURONG ISLANDROTARY SCAFFOLDING & CONSTRUCTION PTE LTDFACI ASIA PACIFIC PTE LTDElectrical & Instrumentation works.May '00Aug '00
36SENOKO POWER STATION 230kV SWITCHHOUSE `A' UPGRADING PROJECTALSTOM T&D PTE LTDPOWER SENOKO LTDInstallation of panels for AC/DC System, Cable Ladders & Trays and Cable Laying & Termination Works. Modification of 230kV GIS PTs & CTs.Jan '00Oct '01
35SINCOR DOWNSTREAM PROJECT FOR MODULE FABRICATION & ASEMBLY AT SEMBAWANG SHIPYARDROTARY ELECTRICAL CO. LTD.SINCORElectrical & Instrumentation works.Dec '99Jun '00
34ROTARY INTEGRATED MAINTENANCE CENTRE (IMC) AT JURONG ISLANDROTARY IMC PTE LTDROTARY ENGINEERING LTDWorkshop, Fabrication & Paint Workshop & Repair Shop - Supply & Installation of Lighting, Power, Tel & Data system, Fire Alarm & CCTV System and Lightning & Grounding system.Nov '99Feb '01
33FATTY ACIDS DERIVATIVES PLANT AT JURONG ISLANDROTARY SCAFFOLDING & CONSTRUCTION PTE LTDFACI ASIA PACIFIC PTE LTDOffice Bldg. Workshop & Utility Area - Supply & Installation of Lighting, Power, Tel & Data system, Fire Alarm & CCTV System and Lightning & Grounding system.Nov '99Sep '00
32EXXON CHEMICAL PLANT SPP PROJECT SUBSTATION AT JURONG ISLANDSANKO SINGAPORE PTE LTDEXXON CHEMICAL SINGAPOREInstallation of 33/0.4kV Transformer, L.T. Switchgear, MCC Panel & Associated Equipment.Sep '99Nov '99
31WOODLANDS WAFER 66kV SUBSTATIONCEGELEC SINGAPORE PTE LTDPOWER GRID SINGAPORE66kV GIS & Associated Equipment Installation, Cable Supporting &
Termination Works.
Jun '99Oct '99
30WOODLANDS LINK 66kV SUBSTATIONCEGELEC SINGAPORE PTE LTDPOWER GRID SINGAPORE66kV GIS & Associated Equipment Installation, Cable Supporting &
Termination Works.
Apr '99Aug '99
29AJUNIED 66kV SUBSTATIONCEGELEC SINGAPORE PTE LTDPOWER GRID SINGAPORE66kV GIS & Associated Equipment Installation, Cable Supporting &
Termination Works.
Mar '99May '99
28SERANGOON SECONDARY SCHOOLINTEGRATED ENVIROMENTAL SOULTION PTE LTDMININSTRY OF EDUCATIONBuilding Services Supply & Installation for Lighting Power Telephone System, P.A & Intercom System, Fire & Security system, MATV & SCV system, Lightning Protection & Earthing System.Oct '98Oct '99
27SEMBAWANG SHIPYARD LAMINARA AND COLLARINA DEVELOPMENT PROJECTROTARY ENGINEERING LTDSEMBAWANG MARINE & OFFSHORE ENGR'G PTE LTDElectrical & Instrumentation Works.Jul ' 98Mar ' 98
2666kV PANDAN LOOP SUBSTATIONHITACHI PLANT ENGINEERING & CONSTRUCTION CO. LTDPOWER GRID SINGAPORE66kV GIS & Associated Equipment Installation, Cable Supporting &
Termination Works.
Nov '97Apr '98
25TUAS POWER STATION 400/230/66kV SWITCHHOUSE -230kvHITACHI PLANT ENGINEERING & CONSTRUCTION CO. LTDPOWER GRID SINGAPORE66kV GIS & Associated Equipment Installation, Cable Supporting &
Termination Works. Installation of 230kV Oil-filled Power Cable.
Aug '97Jun '98
24400kV AUTO-TRANSFORMERS & SHUNT REACTORS INSTALLATION FOR AYER RAJAH & LABRADOR 400/230Kv SUBSTATIONCEGELEC SINGAPORE PTE LTD and HITACHI PLANT ENGINEERING & CONSTRUCTION CO. LTDPOWER GRID SINGAPOREErection 500MVA Transformers, 100MVA Shunt Reactor. 230kV & 66kV Power Cabling, control & Protection Cabling and Termination Works.Apr '97Feb '98
23TUAS POWER STATION 400/230/66kV SWITCHHOUSE -66kVHITACHI PLANT ENGINEERING & CONSTRUCTION CO. LTDPOWER GRID SINGAPORE66kV GIS & Associated Equipment Installation, Cable Supporting &
Termination Works. Cabling Works for all Transformers, including 66kV XLPE Power Cable of 1000sq.mm
Sep '96Feb '98
22PUB 66/22kV SERANGOON NORTH SUBSTATIONHITACHI PLANT ENGINEERING & CONSTRUCTION CO. LTDPOWER GRID SINGAPORE66kV GIS & Associated Equipment Installation, Cable Supporting &
Termination Works.
Sep '96Feb '97
21GLAXO CHEMICAL PLANT EXTENSIONROTARY ENGINEERING LTDGLAXO SINGAPOREElectrical & Instrumentation Works.Aug '96Apr '97
20PHTHALIC ANHYDRIDE PLANT FOR DOVECHEM PETROLCHEMICALROTARY ENGINEERING LTDDOVECHEM PETROLCHEMICALsupply & Installation of air-conditioning system for Various Building.Aug '96Nov '96
19PUB 66/22kV TANJUNG RHU SUBSTATIONHITACHI PLANT ENGINEERING & CONSTRUCTION CO. LTDPUB SINGAPORE66kV GIS & Associated Equipment Installation, Cable Supporting &
Termination Works.
Apr '96Sep '96
18SINGAPORE AROMATIC PROJECT REMOTE INSTRUMENT BUILDINGSROTARY ENGINEERING LTDESSO SINGAPOREElectrical Engineering & Installation of Power & Lighting Works.May '95Feb ' 96
17PUB 22kV PULAU AYER RAJAH MERBAU SUBSTATIONHITACHI PLANT ENGINEERING & CONSTRUCTION CO. LTDPUB SINGAPORE66kV GIS & Associated Equipment Installation, Cable Supporting &
Termination Works.
Nov '95Apr '96
16SENOKO GAS WORKROTARY - SANKO ENGINEERING PTE LTDPUB SINGAPOREElectrical, Control & Instrumentation Work.Apr '95Aug '96
15MRTC - ULU PANDAN DEPOT CHEMICAL WASH PLANTMITSUI & CO LIMITEDLAND AUTHORITY SINGAPOREElectrical & Mechanical Installation for Complete Automatic Chemical Wash system.May '95Nov '95
14KANEKA PLANT SINGAPOREROTARY - SANKO ENGINEERING PTE LTDKANEKA SINGAPOREPlant Electrical and Instrumentation Installation.Nov' 94Feb '95
13SRC-RCC EXPANSION PROJECTROTARY ENGINEERING LTDSRCInstallation of Plant Power and Lighting System.Sep '94Apr '95
12PUB 66/22kV PIONEER SECTOR SUBSTATIONHITACHI PLANT ENGINEERING & CONSTRUCTION CO. LTDPUB SINGAPORE66kV GIS & Associated Equipment Installation, Cable Supporting &
Termination Works.
Sep '94Dec '94
11SRS-RCC CONSUMER 22kV SUBSTATIONROTARY ENGINEERING LTDSRCElectrical, Fire Alarm & Lightning Protection System Installation.Jul '95Jun '95
10PUB 66/22kV PULAU MERLIMAU INTAKE SUBSTATIONHITACHI PLANT ENGINEERING & CONSTRUCTION CO. LTDPUB SINGAPORE66kV GIS & Associated Equipment Installation, Cable Supporting &
Termination Works.
May '94Oct '94
9PUB 66/22kV PUB BUILDING SUBSTATIONHITACHI PLANT ENGINEERING & CONSTRUCTION CO. LTDPUB SINGAPORE66kV GIS & Associated Equipment Installation, Cable Supporting &
Termination Works.
Mar '94Aug '94
8PUB 66/22kV NTU SUBSTATIONHITACHI PLANT ENGINEERING & CONSTRUCTION CO. LTDPUB SINGAPORE66kV GIS & Associated Equipment Installation, Cable Supporting &
Termination Works.
Jan '94Jul '94
7SSP PILOT PLANT FOR TETRA LAVAL SINGAPOREROTARY ENGINEERING LTDTETRA LAVAL SINGAPOREPower & Lighting Installation and Process Control Cabling Works.Oct '93Apr '94
6SRC-66kV INTAKE SUBSTATIONROTARY ENGINEERING LTDSRCBuilding Electrical Services, fire alarm & Lightning System.Oct '93Mar '94
5GLAXO CHEMICAL PLANT EXPANSION PROJECTROTARY ENGINEERING LTDGLAXO SINGAPOREPlant Power & Lighting and Building Lightning Protection System.Nov '93May '93
4PULAU AYER CHAWAN PARAMINS PLANT PROJECTROTARY ENGINEERING LTDESSO SINGAPORECable Supporting System, Control Cables Laying & Termination.
Sep '93Oct '93
3JURONG CHD-3 PROJECT (MOBIL OIL SINGAPORE)ROTARY ENGINEERING LTDMOBIL OIL SINGAPOREPlant Power and Lighting System InstallationJul '93Nov '93
2PROPOSED FACTORY CUM
OFFICE ON PLOT A 12561 MK 7
ROTARY ENGINEERING LTDROTARY ENGINEERING LTDElectrical Installation for Power & Lighting Works,
Fire Alarm System &
Lighting Protection.
May '93Nov '93
1PUB 66/22kV CHANGI
AIRPORT SUBSTATION
HITACHI PLANT ENGINEERING & CONSTRUCTION CO. LTDPUB SINGAPORE66kV GIS & Associated Equipment Installation, Cable Supporting & Termination Work
Apr '93Oct '93